TUPC12 | Status of the Stripline Beam Position Monitor Development for the CLIC Drive Beam | 384 |
|
||
Funding: MINECO contract FPA2010-21456-C02-01, SEIC-2010-00028, U.S. Department of Energy contract DE-AC02-76SF00515 In collaboration with SLAC, LAPP and IFIC, a first prototype of a strip-line Beam Position Monitor (BPM) for the CLIC Drive Beam and its associated readout electronics has been successfully tested in the CLIC Test Facility linac (CTF3) at CERN. In addition, a modified prototype with downstream terminated strip-lines is under development to better suppress any unwanted RF signal interference. This paper presents the results of the beam tests, the most relevant design aspects for the modified strip-line BPM version and its expected performance. |
||
![]() |
Poster TUPC12 [1.729 MB] | |
TUPC19 | First Beam Tests of a Prototype Cavity Beam Position Monitor for the CLIC Main Beam | 411 |
|
||
Beam position monitors (BPMs) throughout the CLIC (Compact Linear Collider) main linac and beam delivery system must routinely operate at 50 nm resolution and be able to make multiple position measurements within a single 156 ns long bunch train. A prototype cavity beam position monitor, designed to demonstrate this performance, has been tested on the probe beamline of CTF3 (the CLIC Test Facility). Sensitivity measurements of the dipole mode position cavity and of the monopole mode reference cavity have been made. The characteristics of signals from short and long bunch trains and the dominant systematic effects have also been studied. | ||
TUPC20 | Technologies and R&D for a High Resolution Cavity BPM for the CLIC Main Beam | 415 |
|
||
The Main Beam (MB) LINAC of the Compact Linear Collider (CLIC) requires a beam orbit measurement system with a high spatial (50 nm) and high temporal (50 ns) resolution to resolve the beam position within the 156 ns long bunch train, traveling on an energy-chirped, minimum dispersive trajectory. A 15 GHz prototype cavity BPM has been commissioned in the probe beam-line of the CTF3 CLIC Test Facility. The performance and technical details of this prototype installation are discussed in this paper, including the 15 GHz analog down-converter, the data acquisition and the control electronics and software. An R&D outlook is given for the next steps, which requires a system of 3 cavity BPMs to investigate the full resolution potential. | ||