Paper | Title | Page |
---|---|---|
TUPC12 | Status of the Stripline Beam Position Monitor Development for the CLIC Drive Beam | 384 |
|
||
Funding: MINECO contract FPA2010-21456-C02-01, SEIC-2010-00028, U.S. Department of Energy contract DE-AC02-76SF00515 In collaboration with SLAC, LAPP and IFIC, a first prototype of a strip-line Beam Position Monitor (BPM) for the CLIC Drive Beam and its associated readout electronics has been successfully tested in the CLIC Test Facility linac (CTF3) at CERN. In addition, a modified prototype with downstream terminated strip-lines is under development to better suppress any unwanted RF signal interference. This paper presents the results of the beam tests, the most relevant design aspects for the modified strip-line BPM version and its expected performance. |
||
![]() |
Poster TUPC12 [1.729 MB] | |