|
- C. Belver-Aguilar, A. Faus-Golfe
IFIC, Valencia, Spain
- M.J. Barnes
CERN, Geneva, Switzerland
- F. Toral
CIEMAT, Madrid, Spain
|
|
|
Pre-Damping Rings (PDRs) and Damping Rings (DRs) are needed to reduce the beam emittance and, therefore, to achieve the luminosity requirements for the CLIC main linac. Several stripline kicker systems will be used to inject and extract the beam from the PDRs and DRs. Results of initial studies of the stripline cross-section and the beam coupling impedance, for a non-tapered beam pipe, have previously been reported. In this paper, we present the analysis to study the final choice of the cross-section design, based on impedance matching and field inhomogeneity requirements, the power reflected in the transition between an electrode and the input coaxial feedthrough, and the predicted beam coupling impedance. Mechanical tolerances for the stripline manufacturing process are presently being studied. The striplines are planned to be prototyped by December 2012.
|
|