Paper |
Title |
Page |
TUPB53 |
Abort Diagnostics and Analysis during KEKB Operation |
477 |
|
- H. Ikeda, J.W. Flanagan, T. Furuya, M. Tobiyama
KEK, Ibaraki, Japan
- M. Tanaka
Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
|
|
|
KEKB has stopped since June 2010 for upgrading the luminosity 40 times, i.e. SuperKEKB. During the operation of 11 years, a pair of controlled beam abort systems worked more than 10000 times to protect the hardware components of KEKB accelerator and the detector against the high intensity beams of LER and HER. Optimization of the abort trigger was necessary to balance efficient operation with the safety of the hardware. Therefore, we analyzed one-by-one all of the aborts, and continually adjusted the abort system. The diagnostic system was based on a high-sampling-rate data logger that recorded beam currents, RF signals and beam loss monitor signals. The beam oscillation signals, vacuum pressure and detector dose rate were also examined. This paper describes the typical abort causes, optimizations of abort levels, and abort statistics over approximately eight years after having arrived at high beam current operation.
|
|
|