Author: Nicholson, D.J.
Paper Title Page
TUPA44 Status of the LCLS Experiment Timing System 453
 
  • J.C. Frisch, C. Bostedt, R.N. Coffee, A.R. Fry, N. Hartmann, J. May, D.J. Nicholson, S. Schorb, S.R. Smith
    SLAC, Menlo Park, California, USA
 
  Funding: Work Supported by Department of Energy Contract DE AC03 76SF00515
X-ray / optical laser pump - probe experiments are used for a significant fraction of the scientific work performed at LCLS. The experimental laser systems are locked to the timing of the electron beam through a combination of RF and optical fiber based systems. The remaining ~100 femtosecond RMS jitter of the X-rays relative to the optical laser is measured shot-to-shot by both a RF timing detector, and by direct X-ray to optical cross-correlation, and the result is used to correct the experiment timing to 10s of femtoseconds. We present the present status of the system and plans for future upgrades.