Paper |
Title |
Page |
MOPA28 |
Turn-by-turn BPM System using Coaxial Switches and ARM Microcontroller at UVSOR |
112 |
|
- T. Toyoda
IMS, Okazaki, Japan
- K. Hayashi, M. Katoh
UVSOR, Okazaki, Japan
|
|
|
A major upgrade of the electron storage ring at UVSOR (Institute for Molecular Science, Japan) started from April 2012. To assist the commissioning procedure, we have developed a turn-by-turn Beam Position Monitor (BPM) system which consists of a signal switching circuit, a digital oscilloscope and software. The storage ring has 24 BPMs, each of which consists of four electrodes. By using the signal switching circuit, we can select one BPM from eight BPM's. The four signals from the BPM are sent to a digital oscilloscope and are recorded. In the switching circuit, coaxial switches of SPDT (Single Pole Dual Throw) and SP4T type are used. To control coaxial switches, we adopted 'mbed', the ARM microcontroller development kit. The 'mbed' stores the control applications configured in the HTML file and JavaScript library which can handle multiple I/O ports. It responds as a HTTP server and the control application runs on a Web browser. By clicking buttons with a mouse, we can control the I/O ports of 'mbed' through JavaScript library and accordingly can control coaxial switches. In the presentation, we will report the detail of the developed BPM system and its performance.
|
|
|
TUPB60 |
Beam Diagnostics of Central Japan Synchrotron Radiation Research Facility Accelerator Complex |
486 |
|
- M. Hosaka, A. Mano, H. Morimoto, E. Nakamura, K. Takami, T. Takano, Y. Takashima, N. Yamamoto
Nagoya University, Nagoya, Japan
- Y. Hori
KEK, Ibaraki, Japan
- M. Katoh
UVSOR, Okazaki, Japan
- S. Koda
SAGA, Tosu, Japan
- A. Murata, K. Nakayama
Toshiba, Yokohama, Japan
- S. Sasaki
JASRI/SPring-8, Hyogo-ken, Japan
|
|
|
A new synchrotron radiation facility, Central Japan Synchrotron Radiation Research Facility is built in Aichi area. The light source accelerator complex consists of a 1.2 GeV compact electron storage ring and a full energy injector for top-up operation. The key equipments of the accelerator are four 5 T superconductive bending magnets. Although the acceleration energy of the storage ring is relatively low, synchrotron radiation from the superconductive bending magnet reaches hard X-ray region and can be provided for more than 10 beamlines. Construction of the facility started in 2010 and finished in Apr. 2012. Commissioning of the accelerator complex started in Mar. 2012. We adapted a turn-by-turn beam position monitoring system based on a digital oscilloscope developed at the UVSOR. In the presentation, we report on details of beam diagnostics conducted during the commissioning.
|
|
|