Author: Faus-Golfe, A.
Paper Title Page
MOPA01 Design Study of the Striplines for the Extraction Kicker of the CLIC Damping Rings 47
 
  • C. Belver-Aguilar, A. Faus-Golfe
    IFIC, Valencia, Spain
  • M.J. Barnes
    CERN, Geneva, Switzerland
  • F. Toral
    CIEMAT, Madrid, Spain
 
  Pre-Damping Rings (PDRs) and Damping Rings (DRs) are needed to reduce the beam emittance and, therefore, to achieve the luminosity requirements for the CLIC main linac. Several stripline kicker systems will be used to inject and extract the beam from the PDRs and DRs. Results of initial studies of the stripline cross-section and the beam coupling impedance, for a non-tapered beam pipe, have previously been reported. In this paper, we present the analysis to study the final choice of the cross-section design, based on impedance matching and field inhomogeneity requirements, the power reflected in the transition between an electrode and the input coaxial feedthrough, and the predicted beam coupling impedance. Mechanical tolerances for the stripline manufacturing process are presently being studied. The striplines are planned to be prototyped by December 2012.  
 
TUPB70 The ATF2 Multi-OTR System: Studies and Design Improvements 505
 
  • J. Alabau-Gonzalvo, C. Blanch Gutierrez, A. Faus-Golfe, J.J. García-Garrigós, J. Resta-López
    IFIC, Valencia, Spain
  • J. Cruz, D.J. McCormick, G.R. White, M. Woodley
    SLAC, Menlo Park, California, USA
 
  Funding: Funding Agency: FPA2010-21456-C02-01 Work supported in part by Department of Energy Contract DE-AC02-76SF00515.
A multi-Optical Transition Radiation system made of four stations has been installed in the extraction line of ATF2 and has been fully operational since September 2011. The system is being used routinely for beam size and emittance measurements as well as for coupling correction and energy spread measurements. In this paper we present the beam sizes and emittance measurements performed during 2012 runs as well as a detailed study of the experimental single-shot automated coupling correction and the comparison with the simulations. Wakefields problems experimented with the simultaneous measurement has been studied and will be solved by new target holders that will be installed in the next Fall 2012 run.