Paper | Title | Page |
---|---|---|
C-09 | Design of the MEBT Rebunchers for the SPIRAL 2 Driver | 278 |
|
||
The Spiral 2 project uses normal conducting rebunchers to accelerate high intensity beams of protons, deuterons and heavier ions. All cavities work at 88 MHz, the beta is 0.04 and 3 rebunchers are located in the MEBT line, which accepts ions with A/q up to 6. The paper describes the RF design and the technological solutions proposed for an original 3-gap cavity, characterised by very large beam aperture (60 mm) and providing up to 120 kV of effective voltage. |