The Beam Commissioning of BRIF and Future Cyclotron Development at CIAE  
 
  • T.J. Zhang
    CIAE, Beijing, People's Republic of China
 
  As an upgrade project of the existing HI-13 tandem accelerator facility, the Beijing Radioactive Ion-beam Facility (BRIF) is being constructed in China Institute of Atomic Energy (CIAE). This project consists of a 100MeV proton compact cyclotron, a two-stages ISOL system, a superconducting linac booster and various experimental terminals. In this talk, the construction progress of BRIF will be presented in detail. The beam commissioning of the cyclotron is in progress and we got the first 100 MeV beam on July 4, 2014. The beam current was stably maintained at above 25 uA for about 9 hours on July 25, 2014, which is ready for providing CW beam on target for RIB production. The installation of ISOL system is finished and the stable ion beam test shows it can reach a mass resolution better than 10000. It is expected to generate dozens of RIB by 100 MeV proton beam. In additions, this talk also introduce the recent progress of the pre-study of a 800 MeV, 3-4 MW separate-sector proton cyclotron, which is proposed to provide high power proton beam for various applications, such as neutron and neutrino physics, proton radiography and nuclear data measurement and ADS study as well.  
slides icon Slides WEO1AB02 [6.556 MB]