Author: Bertrand, P.
Paper Title Page
TUO3AB03 Initial Commissioning of Ion Beams at SPIRAL2 211
 
  • P. Bertrand
    GANIL, Caen, France
 
  The official reception of the SPIRAL2 accelerator building occurred in October 2014. In parallel, the installation of the accelerator components has started in June 2013. The first part of the beam commissioning, including the ECR sources, the LEBTs and the 88 MHz RFQ should start in December, with an injection in the Linac by mid-2015. This paper describes the status of the accelerator components and installation, and the philosophy retained to commission the light and heavy ion beams at various required final energies.  
slides icon Slides TUO3AB03 [9.473 MB]