A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Rees, G.H.

Paper Title Page
WGE15 Megawatt Upgrades for the ISIS Facility 434
 
  • J.W.G. Thomason, D.J. Adams, D.J.S. Findlay, I.S.K. Gardner, B. Jones, A.P. Letchford, S.J. Payne, B.G. Pine, A. Seville, C.M. Warsop, R.E. Williamson
    STFC/RAL/ISIS, Chilton, Didcot, Oxon
  • D.C. Plostinar, C.R. Prior, G.H. Rees
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
 
 

ISIS is the world’s most productive spallation neutron source, at the Rutherford Appleton Laboratory in the UK. Presently, it runs at beam powers of 0.2 MW, with upgrades in place to supply increased powers for the new Second Target Station due to start operation in 2008. This paper outlines favoured schemes for major upgrades to the facility in the megawatt regime, with options for 1, 2 and 5 MW. The ideas centre around new 3.2 GeV RCS designs that can be employed to increase the energy of the existing ISIS beam to provide powers of ~1 MW or, possibly as a second upgrade stage, accumulate and accelerate beam from a new 0.8 GeV linac for 2-5 MW beams. Summaries of ring designs are presented, along with studies and simulations to assess the key loss mechanisms that will impose intensity limitations. Important factors include injection, RF systems, instabilities, longitudinal and transverse space charge.

 

slides icon

Slides