A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Letchford, A.P.

Paper Title Page
WGE15 Megawatt Upgrades for the ISIS Facility 434
 
  • J.W.G. Thomason, D.J. Adams, D.J.S. Findlay, I.S.K. Gardner, B. Jones, A.P. Letchford, S.J. Payne, B.G. Pine, A. Seville, C.M. Warsop, R.E. Williamson
    STFC/RAL/ISIS, Chilton, Didcot, Oxon
  • D.C. Plostinar, C.R. Prior, G.H. Rees
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
 
 

ISIS is the world’s most productive spallation neutron source, at the Rutherford Appleton Laboratory in the UK. Presently, it runs at beam powers of 0.2 MW, with upgrades in place to supply increased powers for the new Second Target Station due to start operation in 2008. This paper outlines favoured schemes for major upgrades to the facility in the megawatt regime, with options for 1, 2 and 5 MW. The ideas centre around new 3.2 GeV RCS designs that can be employed to increase the energy of the existing ISIS beam to provide powers of ~1 MW or, possibly as a second upgrade stage, accumulate and accelerate beam from a new 0.8 GeV linac for 2-5 MW beams. Summaries of ring designs are presented, along with studies and simulations to assess the key loss mechanisms that will impose intensity limitations. Important factors include injection, RF systems, instabilities, longitudinal and transverse space charge.

 

slides icon

Slides

 
WGF07 Beam Diagnostics at the RAL Front-End Test Stand – First Results and New Ideas 458
 
  • J.K. Pozimski
    STFC/RAL, Chilton, Didcot, Oxon
  • D.C. Faircloth, S.R. Lawrie, A.P. Letchford
    STFC/RAL/ISIS, Chilton, Didcot, Oxon
  • C. Gabor
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
  • S. Jolly, D.A. Lee
    Imperial College of Science and Technology, Department of Physics, London
 
 

In order to contribute to the development of high power proton accelerators in the MW range a front end test stand (FETS) is being constructed at the Rutherford Appleton Laboratory (RAL) in the UK. The aim of the FETS is to demonstrate the production of a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV with sufficient beam quality. Therefore a comprehensive set of diagnostic tools have been developed or are in the design and construction phase. To improve the beam quality delivered by the Penning H- ion source using a slit extraction, a pepper pot emittance measurement device and a 2D-transversal profile scanner has been built and used on the ion source development rig and results of the beam measurements will be presented. As destructive diagnostic devices suffer from the high beam power deposited on the device surfaces, two new diagnostic devices based on the photo detachment principle are under construction: A laser wire scanner allowing the reconstruction of the full 2D-transversal density distribution using tomographic techniques and an emittance scanner device. The design and status of construction of both devices will be presented and new ideas for the data analyses discussed.

 

slides icon

Slides