Paper | Title | Page |
---|---|---|
WGD12 | The NumI Proton Beam at Fermilab: Successes and Challenges | 379 |
|
||
The NuMI beam at Fermilab has delivered almost 5x10 20 120 GeV protons to the neutrino production target, since the start for MINOS physics operation in 2005. We will report on beam operation status, including successes and challenges to date with the beam and NuMI system technical components. Also covered will be the ongoing program of increasing NuMI beam power using slip stacking of beam in the Main Injector accelerator. |
||
|
||
WGF12 | NuMI Proton Beam Diagnostics and Control: Achieving 2 Megawatt Capability | 475 |
|
||
The NuMI proton beam at Fermilab currently delivers 120 GeV protons to the neutrino production target at beam powers up to 320 kW, with design capability to 400 kW. We are preparing for upgrade to 700 kW, and are in planning stage for delivering 2.3 MW beam provided by the Project X accelerator upgrade. We will report on the system of beam diagnostics and control used in operation of the NuMI beam, and the experience to date. Also covered will be the steps to provide a robust system for transport and targeting beam of 2 MW and beyond. |
||
|