Yavas, O.

Paper Title Page
TUPC39 Technical Design Studies of TAC SASE FEL Proposal 325
 
  • B. Ketenoğlu, M. Tural, O. Yavas
    Ankara University, Faculty of Engineering, Tandogan, Ankara
  • P. Arikan
    Gazi University, Faculty of Arts and Sciences, Teknikokullar, Ankara
  • S.O. Ozkorucuklu
    SDU, Isparta
  • O. Sahin, I. Tapan
    UU, Bursa
 
 

A SASE FEL facility was first proposed in Feasibility Report of the TAC (Turkish Accelerator Center) project in 2000. Conceptual Design Report (CDR) of the project was completed in 2005. Technical Design Report (TDR)studies of TAC were started in 2006 in frame of an inter universities project with support of State Planning Organization (SPO) of Turkey. Main goal of the SASE FEL proposal is to cover VUV and soft X-rays region of the spectrum besides IR-FEL, Bremsstrahlung and Synchrotron Radiation proposals of TAC. Up to now, optimization studies based on a special RF linac or an Energy Recovery Linac (ERL) for the SASE FEL facility were completed. Today, ERLs provide a powerful broad range of applications like: electron cooling devices, high average brightness, high power FELs, short-pulse radiation sources and high luminosity colliders. In this study, main parameters for two linac options and SASE FEL are given.


*On behalf of the TAC SASE FEL working group

 
WEPC38 The TAC IR FEL Oscillator Facility Project 580
 
  • B. Ketenoğlu, A. Aksoy, Ö. Karsli, M. Tural, O. Yavas
    Ankara University, Faculty of Engineering, Tandogan, Ankara
  • H. Aksakal
    N.U, Nigde
  • P. Arikan, E. Kasap
    Gazi University, Faculty of Arts and Sciences, Teknikokullar, Ankara
  • B. Bilen
    Ankara University, Faculty of Sciences, Tandogan/Ankara
  • H. Duran Yildiz
    Dumlupinar University, Faculty of Science and Arts, Kutahya
  • S.O. Ozkorucuklu
    SDU, Isparta
  • I. Tapan
    UU, Bursa
 
 

The TAC (Turkish Accelerator Center) IR FEL Oscillator facility, which has been supported by Turkish State Planning Organization (SPO) since 2006, will be based on a 15-40 MeV electron linac accompanying two different undulators with 2.5 cm and 9 cm periods in order to obtain IR FEL ranging between 2-250 microns. The electron linac will consist of two sequenced modules, each housing two 9-cell superconducting TESLA cavities for cw operation. It is planned that the TAC IR FEL facility will be completed in 2012 at Golbasi campus of Ankara University. This facility will give an opportunity to the scientists and industry to use FEL in research and development in Turkey and our region. In this study, the results of optimization studies and present plans about construction process of the facility are presented.