|
Vertical beam size blowup with the gain of the transverse bunch feedback systems has been observed in KEKB B-factory rings. With the numerical simulation, large beam-beam effect enhances small oscillation induced by the broadband noise of the bunch feedback kick. To examine the simulation, beam response, effective beam size and the luminosity change with artificial external noise injected in the transverse feedback system have beem measuredn in KEKB LER ring during collision. The result has been compaired with the simulation including beam-beam effect and showed good agreement.
|
|