Author: Lin, K.-K.
Paper Title Page
TUPD04 Diagnostics for the 150 MeV Linac and Test Transport Line of Taiwan Photon Source 308
 
  • C.-Y. Liao, Y.-T. Chang, J. Chen, Y.-S. Cheng, P.C. Chiu, K.T. Hsu, S.Y. Hsu, K.H. Hu, C.H. Kuo, D. Lee, K.-K. Lin, K.L. Tsai, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  The TPS 150 MeV linac is in installation and commissioning phase at the test site for acceptance test. The linac will move to the final installation site after the building complete which is expected in 2012. The linac and a short transport line for main parameters measurement equips with several types of diagnostic devices, which include screen monitors, fast current transformers, integrated current transformer, wall current monitors, beam position monitors and Faraday cups. These devices are arranged to measure the specification parameters such as charge in bunch train, pulse purity, energy, energy spread, and emittance. Implementation details and preliminary test results will be summarized in this report.