Paper |
Title |
Page |
TUOA02 |
Diagnostics during the ALBA Storage Ring Commissioning |
280 |
|
- U. Iriso, M. Alvarez, F.F.B. Fernandez, A. Olmos, F. Pérez
CELLS-ALBA Synchrotron, Cerdanyola del Vallès, Spain
|
|
|
The ALBA Storage Ring is a 3GeV 3rd Generation Synchrotron Light Source whose 1st phase commissioning took place in Spring 2011. The machine is equipped with 123 BPMs, striplines, several fluorescent screens, FCT and DCCT, 128 BLMs, and two front ends strictly used for electron beam diagnostics (pinhole and streak camera). This paper presents an overview of the Diagnostics elements installed in the machine and our experience during the commissioning.
|
|
|
Slides TUOA02 [5.476 MB]
|
|
|