Author: Dallocchio, A.
Paper Title Page
MOPD18 Embedded Collimator Beam Position Monitors 80
 
  • C.B. Boccard, A. Bertarelli, A. Dallocchio, M. Gasior, L. Gentini, A.A. Nosych
    CERN, Geneva, Switzerland
 
  The LHC collimation system is crucial for safe and reliable operation of proton beams with 350 MJ stored energy. Currently the collimator set-up is performed by observing beam losses when approaching the collimator jaws to the beam. For all 100 LHC movable collimators the procedure may take several hours and since it has to be repeated whenever the beam configuration changes significantly, the collimator setup has an important impact on the overall machine operation efficiency. To reduce the collimator setup time by two orders of magnitude the next generation of the LHC collimators will be equipped with button beam position monitors (BPMs) embedded into the collimator jaws. This paper describes the BPM design and presents prototype results obtained with beam in the CERN-SPS.  
poster icon Poster MOPD18 [1.729 MB]