Diagnostic Scheme for the HITRAP Decelerator |
311 |
|
- G. Vorobjev, C.A. Andre, W.A. Barth, E. Berdermann, M.I. Ciobanu, G. Clemente, L.A. Dahl, P. Forck, P. Gerhard, R. Haseitl, F. Herfurth, M. Kaiser, W. Kaufmann, H.J. Kluge, N. Kotovski, C. Kozhuharov, M.T. Maier, W. Quint, A. Reiter, A. Sokolov, T. Stöhlker
GSI, Darmstadt, Germany
- O.K. Kester, J. Pfister, U. Ratzinger, A. Schempp
IAP, Frankfurt am Main, Germany
|
|
|
The HITRAP linear decelerator currently being set up at GSI will provide slow, few keV/u highly charged ions for atomic physics experiments. The expected beam intensity is up to 105 ions per shot. To optimize phase and amplitude of the RF systems intensity, bunch length and kinetic energy of the particles need to be monitored. The bunch length that we need to fit is about 2 ns, which is typically measured by capacitive pickups. However, they do not work for the low beam intensities that we face. We investigated the bunch length with a fast CVD diamond detector working in single particle counting mode. Averaging over 8 shots yields a clear, regular picture of the bunched beam. Energy measurements by capacitive pickups are limited by the presence of intense primary and partially decelerated beam and hence make tuning of the IH-structure impossible. The energy of the decelerated fraction of the beam behind the first deceleration cavity was determined to about 10 % accuracy with a permanent dipole magnet combined with a MCP. Better detector calibration should help reaching the required 1%. Design of the detectors as well as the results of the measurements will be presented.
|
|
|
TUPD24 |
Design Status of Beam Position Monitors for the FAIR Proton Linac |
356 |
|
- C.S. Simon, F. Senée
CEA/DSM/IRFU, France
- G. Clemente, P. Forck, W. Kaufmann, P. Kowina
GSI, Darmstadt, Germany
|
|
|
Beam Position Monitors (BPM) based on capacitive buttons are designed for the FAIR Proton-LINAC, constructed as an extension of the existing GSI facility. This LINAC is aiming to produce a maximum design current of 70 mA at the 70 MeV energy with an accelerating frequency of 325 MHz. At 14 locations, the BPMs will measure the transverse beam position, the relative beam current and the mean beam energy by time-of-flight method. Depending of the location, the BPM design has to be optimized, taking into account an energy range from 3 MeV to 70 MeV, a short insertion and a beam pipe aperture changes from 30 mm to 50 mm. Some of BPMs will be mounted very close to the CH cavities and special care must be taken to suppress the pickup of the strong rf-field from that cavities. In this contribution, the status of the BPM design will be presented.
|
|
|