Paper | Title | Page |
---|---|---|
TUPD74 | The Bunch by Bunch Feedback System in J-PARC Main Ring | 482 |
|
||
We report the current status of the bunch by bunch feedback system for the J-PARC Main Ring. The J-PARC Main Ring is the synchrotron accelerating protons from 3 GeV to 30 GeV. It is normally operating at the intensity of 135 kW. The bunch by bunch feedback system have been developed and used for the normal operation of J-PARC Main Ring. The system aims to reduce the coherent transverse oscillation due to the instabilities or injection errors. It consists of a beam position monitor, a stripline kicker and a signal processing electronics. We've observed the injection error leading to the head-tail oscillation and succeed in damping such kind of oscillations and reducing the beam loss significantly. | ||
![]() |
Poster TUPD74 [1.107 MB] | |