Author: Eliseev, A.V.
Paper Title Page
WEPPO02 Stacking Modes with Barrier Buckets Method in NICA Collider 97
 
  • A.V. Smirnov, I.N. Meshkov, A.O. Sidorin, G.V. Trubnikov
    JINR, Dubna, Moscow Region, Russia
  • A.V. Eliseev
    JINR/VBLHEP, Dubna, Moscow region, Russia
  • T. Katayama
    GSI, Darmstadt, Germany
 
  A new accelerator complex NICA is under construction at JINR now. The main goal of this project is to reach a very high luminosity of 1027 [cm-2 c-1] in the colliding experiments with gold ions in the energy range of 1 – 4.5 GeV/u. Both electron and stochastic cooling methods will be used to provide the necessary beam parameters. The beam stacking in the longitudinal phase space with stationary and moving barrier buckets in NICA Collider under action of cooling methods or without cooling are presented in this report.  
 
THPM2HA01 Present Status of NICA Project 197
 
  • A.V. Smirnov, N.N. Agapov, A.V. Butenko, H.G. Khodzhibagiyan, O.S. Kozlov, I.N. Meshkov, V.A. Mikhailov, A.O. Sidorin, G.V. Trubnikov, A. Tuzikov, V. Volkov
    JINR, Dubna, Moscow Region, Russia
  • A.V. Eliseev
    JINR/VBLHEP, Dubna, Moscow region, Russia
 
  Nuclotron-based Ion Collider fAcility (NICA) is the new accelerator complex being constructed in Joint Institute for Nuclear Research. General goal of the project is to start experimental study of hot and dense strongly interacting QCD matter and search for possible manifestation of signs of the mixed phase and critical endpoint in heavy ion collisions. In this report the present status of the NICA accelerator complex are presented.  
slides icon Slides THPM2HA01 [4.244 MB]