Paper | Title | Page |
---|---|---|
TUPSM074 | Diagnostics During the ALBA Booster Commissioning | 353 |
|
||
The ALBA Booster is a synchrotron designed to accelerate electron beam from 100 MeV to 3 GeV in a 3 Hz cycle. The maximum pulse coming from the ALBA Linac provides 4 mA in the Booster. In order to check all the Booster sub-systems, a Booster pre-commissioning took place during two weeks between December 2009 and January 2010. This paper presents the Diagnostics elements installed in the ALBA Booster and our experience during the Booster pre-commissioning. |