Paper | Title | Page |
---|---|---|
TUPTPF058 | Electron Beam Timing Jitter and Energy Modulation Measurements at the JLab FEL | 247 |
|
||
In this contribution we present results of the timing jitter and energy modulation of the electron beam in the driver energy recovery linac (ERL) for the JLab FEL. Measurements techniques are described. The effects of the timing jitter and the energy modulation on the performance of the FEL are discussed. |
||
WECOTC01 | Near-field Optical Diffraction Radiation Measurements at CEBAF | 332 |
|
||
An optical diffraction radiation (ODR) diagnostic station was recently designed and installed on a CEBAF transfer beam line. The purpose of the setup is to evaluate experimentally the applicability range for an ODR based non interceptive beam size monitor as well as to collect data to benchmark numerical modeling of the ODR. An extensive set of measurements were made at the electron beam energy of 4.5 GeV. The ODR measurements were made for both pulsed and CW electron beam of up to 80 uA. The wavelength dependence and polarization components of the ODR were studied using a set of insertable bandpass filters (500 nm short and 500 nm long pass filter) and polarizers (horizontal and vertical). The typical transverse beam size during the measurements was ~150 microns. Complete ODR data, wavelength and polarization, were recorded for different beam sizes and intensities. The beam size was also measured with an optical transition radiation (OTR) (using the surface of the ODR converter) and wire scanner located next to the ODR station. In this contribution we describe the experimental setup and present the results of the measurements with the comparison to the numerical simulations. |
||
|