Cao, J.

Paper Title Page
MOVTC03 The Progress Of BEPCII Storage Ring Diagnostics System 41
 
  • J. Cao
    IHEP Beijing, Beijing
 
 

As the upgrade project of Beijing Electron Positron Collider (BEPC), BEPCII will still serve both high energy physics experiments and synchrotron radiation applications. The storage ring of BEPCII consists of electron ring (BER), positron ring (BPR) and synchrotron radiation ring (BSR). Up to now, we have completed two stages run. The first stage run started on Nov. 13, 2006 by using conventional magnets instead of superconducting (SC) magnets in the interaction region (IR). The second stage operation started on Oct. 24, 2007 by using SC magnets and without BESIII detector. In this paper, we will present the progress of the BEPCII storage ring diagnostics system along with the BEPCII commissioning, such as how Libera BPM has been used for the BPR first turn measurement and the injection residual orbit research of BER; COD measurement can satisfy the resolution requirement for the beam-beam scan in the IR and for the slow orbit feedback; BCM can help us on the different injection pattern; and the TFB system is important to suppress the strong multibunch instabilities when the higher beam current run. The tune meters and the beam-loss monitors are also described in this paper.

 

slides icon

Slides

 
TUPTPF007 The BEPCII DCCT System 97
 
  • Y. Zhao, J. Cao
    IHEP Beijing, Beijing
 
 

A DC Current Transformer (DCCT) as a standard diagnostic system for beam current plays an important role in BEPCII, the upgrade project of the Beijing Electron Positron Collider. Two DCCTs are operated in the BEPCII storage ring now, separated in electron ring and positron ring, used to monitor the beam current, the beam injection rate and the beam loss rate, meanwhile to help to calculate the beam lifetime. In this paper, the mechanical structure design, readout system and data processing are presented. The progress of DCCTs on each step of BEPCII commissioning, such as improving the beam lifetime,and solution of background noise, are also included.