Paper |
Title |
Other Keywords |
Page |
MPPH100 |
RF Systems for the Betatron Node Scheme Experiment at LBNL |
instability, radio-frequency |
1005 |
|
- S. Lidia, S. De Santis (LBNL) , T. Houck (LLNL)
|
|
TPAH068 |
Upgrade to Initial BPM Electronics Module and Beamline Components for Calibration of the LEDA Beam Position Measurements |
diagnostics |
1369 |
|
- D. Barr, J.D. Gilpatrick, R.B. Shurter (LANL)
|
|
WPAH096 |
Proton Driver Beam Instrumentation |
beam profile monitor, beam-losses, monitoring, residual gas |
2308 |
|
- V.I. Terekhov (Institute of High Energy Physics, Protvino) , J. Crisp, R.C. Webber (FNAL)
|
|
WPAH134 |
Commissioning of the SLS Digital BPM System |
alignment, closed-orbit, digital signal processing, tune |
2397 |
|
- V. Schlott, M. Dach, M. Dehler, R. Kramert, P. Pollet, T. Schilcher (Paul Scherrer Institut) , A. Kosicek, R. Ursic (Instrumentation Technologies) , R. DeMonte, M. Ferianis (Sincrotrone Trieste)
|
|