Paper |
Title |
Page |
TUPC127 |
Utility Design for the 3GeV TPS Electron Storage Ring
|
1365 |
|
- J.-C. Chang, Y.-C. Lin, Y.-H. Liu, Z.-D. Tsai
NSRRC, Hsinchu
- J.-R. Chen
NTHU, Hsinchu
|
|
|
Having been running the Taiwan Light Source (TLS) for fourteen years since its opening in 1993, National Synchrotron Radiation Research Center (NSRRC), Taiwan, has been approved to build a photon source (TPS) last year. TPS is preliminarily designed with 3.0 GeV in energy, 518.4m in circumference and 24 Double-Bend Achromat (DBA). The utility system, including the electrical power, cooling water and air conditioning system of the TPS were designed to meet requirements of high reliability and stability. Because the power consumption of the TPS is estimated about three times that of TLS, energy saving is another consideration. This paper therefore discusses utility design concepts and presents partial design results, including capacity requirements, equipment and piping layouts.
|
|
WEPC142 |
Design of Pulsed Magnets for the Taiwan Photon Source
|
2341 |
|
- C.-H. Chang, C. K. Chan, J.-R. Chen, C.-S. Fann, M.-H. Huang, C.-S. Hwang, F.-Y. Lin, Y.-H. Liu, C.-S. Yang
NSRRC, Hsinchu
|
|
|
A new Taiwan Photon source requires a high stability pulsed magnets for the top-up mode injection operation. We present a preliminary design of the pulsed magnets used for injection into the 3 GeV storage ring. A 0.6 m long kicker magnet prototype is fabricated for testing the field performance. The field testing results are described in this work. The septum magnet with a 0.4 mm thickness stainless steel vacuum chamber is real tested at 3 Hz operation. The field performance, the stray fields and the eddy current effect are presented in this paper.
|
|