A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Wood, M.

Paper Title Page
THPLT148 Beam Loss Monitoring on the CLIC Test Facility 3 2801
 
  • T. Lefevre, M. Velasco, M. Wood
    NU, Evanston
  • H.-H. Braun, R. Corsini, M. Gasior
    CERN, Geneva
 
  The CLIC test facility 3 (CTF3) provides a 3.5A, 1.5s electron beam pulse of 150MeV at the end of the linac. The average beam power is 4 kW. Beam loss will be monitored all along the linac in order to keep the radiation level as low as possible. The heavy beam loading of the linac can lead to time transients of beam position and size along the pulse. To compensate these transients effectively a beam loss monitor (BLM) technology has to be chosen with a time response faster than a few nanoseconds. In this context, two different tests have been performed in 2003 on the already existing part of the CTF3 accelerator. Several detectors based on different technologies were first tested in parallel to determine which one was the most appropriate. A second test, in which the beam was intentionally lost in well defined conditions, was then made with the aim of comparing the measurements with simulation results. We present here the results of these tests and our conclusion for the new system to be developed.