A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Wilmarth, J.

Paper Title Page
THPLT153 Commissioning and Initial Operation of the Isotope Production Facility at the Los Alamos Neutron Science Center 2813
 
  • K.F. Johnson, H.W. Alvestad, W.C. Barkley, D.B. Barlow, D.S. Barr, G.A. Bennett, L.J. Bitteker, E. Bjorklund, W. Boedeker, M.J. Borden, R.A. Cardon, G. Carr, J.L. Casados, S. Cohen, J.F. Cordova, J.A. Faucett, M. Fresquez, F.R. Gallegos, J.D. Gilpatrick, F. Gonzales, F.W. Gorman, M.S. Gulley, M.J. Hall, D.J. Hayden, R.C. Heaton, D. Henderson, D.B. Ireland, G. Jacobson, G.D. Johns, D.M. Kerstiens, A.J. Maestas, A.R. Martinez, D. Martinez, G.C. Martinez, J. Martinez, M.P. Martinez, R. Merl, J.B. Merrill, J. Meyer, M.L. Milder, E.A. Morgan, F.M. Nortier, J.F. O'Hara, F.R. Olovas, M.A. Oothoudt, T.D. Pence, E.M. Perez, C. Pillai, F.P. Romero, C. Rose, L. Rybarcyk, G. Sanchez, J.B. Sandoval, S. Schaller, F.E. Shelley, R.B. Shurter, W. Sommer, M.W. Stettler, J.L. Stockton, J. Sturrock, T.L. Tomei, V.P. Vigil, P.L. Walstrom, P.M. Wanco, J. Wilmarth
    LANL/LANSCE, Los Alamos, New Mexico
  • R.E. Meyer, E.J. Peterson, F.O. Valdez
    LANL, Los Alamos, New Mexico
 
  The recently completed 100-MeV H+ Isotope Production Facility (IPF) at the Los Alamos Neutron Science Center (LANSCE) will provide radioisotopes for medical research and diagnosis, for basic research and for commercial applications. A change to the LANSCE accelerator facility allowed for the installation of the IPF. Three components make up the LANSCE accelerator: an injector that accelerates the H+ beam to 750-KeV, a drift-tube linac (DTL) that increases the beam energy to 100-MeV, and a side-coupled cavity linac (SCCL) that accelerates the beam to 800-MeV. The transition region, a space between the DTL and the SCCL, was modified to permit the insertion of a kicker magnet (23o kick angle) for the purpose of extracting a portion of the 100-MeV H+ beam. A new beam line was installed to transport the extracted H+ beam to the radioisotope production target chamber. This paper will describe the commissioning and initial operating experiences of IPF.