WEPLT020 Installation of A Particle Accelerator: from Theory to Practice. The LHC Example 1864
 
  • C. Hauviller, S. Weisz
    CERN, Geneva
 
  Installing and commissioning the thousands of equipments constituting a Particle Accelerator is a lengthy and complex process. A large number of multidisciplinary teams are involved over a long period lasting usually many years. Diverse boundary constrains must be taken into account: space, a long and narrow tunnel with few accesses, time, with milestones set many years in advance, and obviously budget. A strict organisation associated with the management tools and the right people is the only way to arrive to a success. The keywords are: Knowledge: A unique and up-to-date database of all the elements and their location, Integration: Study the physical position of the elements, suppress the interferences and define the installation methodology, Prevision: Schedule all the activities and update on-line, In-situ management and supervision: Teams dedicated to follow-up, corrective actions and orphan jobs, Safety. After presenting the planned overall organization, the paper will present practical achievements with the example of the LHC machine installation.  
WEPLT042 Scheduling the Installation of the Large Hadron Collider 1924
 
  • S. Weisz, K. Foraz, H. Gaillard, L. Lari
    CERN, Geneva
 
  The size and complexity of the LHC project at CERN calls for a strong co-ordination of all installation activities. The detailed installation planning has to take into account many constraints such as the component production rates, the installation contracts or the transport and handling requirements in a narrow tunnel with limited access points. The planning also needs to be flexible enough to cope with aleas that are unavoidable in such a large project that spans over many years. This paper describes the methodology followed by the team responsible for the planning and logistics in order to stay reactive to the actual progress of the installation and to keep optimizing the usage of resources.