MOPLT127 Diagnosing the PEP-II Injection System 833
 
  • F.-J. Decker, M.H. Donald, R.H. Iverson, A. Kulikov, G.C. Pappas, M. Weaver
    SLAC, Menlo Park, California
 
  The injection of beam into the PEP-II B-Factory, especially into the High Energy Ring (HER) has some challenges. A high background level in the BaBar Detector has so far inhibited us from trickling charge into the HER similar to the Low Energy Ring (LER). Analyzing the injection system has revealed many issues which could be improved. The injection bump between two kickers was not closed, mainly because the phase advance wasn't exactly 180 degrees and the two kicker strengths were not balanced. Additionally we found reflections which kick the stored beam after the main kick and cause the average luminosity to drop about 3% for a 10 Hz injection rate. The strength of the overall kick is nearly twice as high than the design, indicating a much bigger effective septum thickness. Compared with single beam the background is worse when the HER beam is colliding with the LER beam. This hints that the beam-beam force and the observed vertical blow-up in the HER pushes the beam and especially the injected beam further out to the edge of the dynamic aperture or beyond.  
MOPLT146 Trickle-charge: a New Operational Mode for PEP-II 881
 
  • J.L. Turner, S. Colocho, F.-J. Decker, S. Ecklund, A.S. Fisher, R.H. Iverson, C. O'Grady, J. Seeman, M.K. Sullivan, M. Weaver, U. Wienands
    SLAC, Menlo Park, California
  • W. Kozanecki
    CEA/DSM/DAPNIA, Gif-sur-Yvette
 
  In regular top-up-and-coast operation, PEP-II average luminosity is about 70…75% of the peak luminosity due to detector ramp-down and ramp-up times plus the time it takes to top-up both beams. We recently commissioned a new operational mode where the Low Energy Ring is injected continuously without ramping down the detector. The benefits?increased luminosity lifetime and roughly half the number of top-ups per shift?were expected to give an increase in delivered luminosity of about 15% at the same peak luminosity; this was confirmed in test runs. In routine trickle operation, however, it appears that the increase in delivered luminosity is more than twice that due to an increase in availability credited to the more stable operating conditions during trickle operation. In this paper we will present our operational experience as well as some of the diagnostics we use to monitor and maintain tuning of the machine in order to control injection background and protect the detector. Test runs are planned to extend trickle-charge operation to the High Energy Ring as well.