A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Tomizawa, H.

Paper Title Page
MOPKF046 Photoelectron RF Gun Designed as a Single Cell Cavity 411
 
  • H. Dewa, T. Asaka, H. Hanaki, T. Kobayashi, A. Mizuno, S. Suzuki, T. Taniuchi, H. Tomizawa, K. Yanagida
    JASRI/SPring-8, Hyogo
  • J. Sasabe
    Hamamatsu Photonics K.K., Hamakita, Shizuoka
  • M. Uesaka
    UTNL, Ibaraki
 
  The paper describes the recent improvements of S-band RF-gun at SPring-8. The cavity of the gun is a single-cell pillbox, and the copper inner wall is used as a cathode. The electron beam from the cathode was accelerated up to 4.1 MeV at an electric field of 175 MV/m. For emittance compensation, two solenoid magnets were used. A 3m linac and a quadrupole scan emittance diagnostic were added after the RF-gun. The beam energy spread and beam emittance after the linac is presented. The beam emittance measured with quadrupole scan is compered to that measured with double slits just after the RF-gun. For high quantum efficiency, Cs2Te cathode was also tested. It is vacuum sealed in a cartridge-type electric tube and four tubes can be installed in a vacuum chamber behind the cavity. Although the quantum efficiency after RF conditioning for two hours to achieve 90MV/m was 3%, it decreased to 1% after the 28 hours RF conditioning.  
TUPLT075 Improvements of SPring-8 Linac towards Top-up Operation 1327
 
  • S. Suzuki, T. Asaka, H. Dewa, H. Hanaki, T. Kobayashi, T. Masuda, A. Mizuno, T. Taniuchi, H. Tomizawa, K. Yanagida
    JASRI/SPring-8, Hyogo
 
  The top-up operation of the SPring-8 storage ring will start in May, 2004. In order to realize alternative injection into the booster synchrotron in the top-up operation and the NewSUBARU, an AC bending magnet replaced the DC bending magnet in the beam transport line to the booster synchrotron. This magnet operates at 1 Hz with a trapezoid current pattern. The 1-GeV electron beam goes at the bottom of the current pattern to the NewSUBARU or at the top of the pattern to the booster synchrotron. In order to obtain the higher reliability of the linac for the top-up operation, reinforcement of the beam monitor systems, further improvement of RF phase stability and upgrade of the control system were required. BPM?s has been newly installed in energy dispersion sections, and beam transport feedback control is in development. The phase variation in the RF system was reduced by the regulation of the gas pressure in the waveguide of the klystrons drive system. We re-engineered the VME systems to maximize availability of the linac operation considering its reliability, usability, expandability and flexibility.