THPKF017 Status of the Synchrotron Light Source DELTA 2293
 
  • D. Schirmer, U. Berges, J. Friedl, A. Gasper, M. Grewe, P. Hartmann, R.G. Heine, H. Huck, G. Schmidt, C. Sternemann, M. Tolan, T. Weis, C. Westphal, K. Wille
    DELTA, Dortmund
 
  Since 1999, the Dortmunder 1.5 GeV electron storage ring DELTA was continuously extended. The facility serves universities and industries as a source of synchrotron radiation on a regional level. The consolidation of the machine was finally completed in 2002. By now, DELTA, operated for 3000 hours per year, has reached a reliability comparable to other facilities in the world. Large improvements have been made in the installation of the beamlines. At present, two undulator beamlines and several dipole beamlines in the range of soft X-rays are in operation. The 5.3 T superconducting asymmetric wiggler (SAW) serves three beamlines in the hard X-ray regime with circular polarized light. Also the accelerator physics research program has been promoted. The vacuum system was revised during the last year to provide extra space for test sections and additional diagnostics. Substantial progress was achieved by SVD based orbit correction and LOCO based optics modelling as well as detailed CBM studies and a new method for fast tune measurements has been implemented. Future developments for machine improvements, such as DSP-based fast local orbit feedback and a frequent injection mode are in preparation.