MOPLT016 Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS 566
 
  • E.H.R. Gaxiola, A. Antoine, P. Burkel, E. Carlier, F. Castronuovo, L. Ducimetière, Y. Sillanoli, M. Timmins, J.A. Uythoven
    CERN, Geneva
 
  A fast extraction kicker system has been installed in the SPS and successfully used in extraction tests in 2003. It will serve to send beam to the anticlockwise LHC ring and the CNGS neutrino facility. The magnets and pulse generators have been recuperated from an earlier installation and upgraded to fit the present application. Hardware improvements include diode stacks as replacement of the previous dump thyratron switches, a cooling system of the magnets, sensors for its ferrite temperatures and magnetic field quality assessment. In preparation of the future use for 450 GeV/c transfer to LHC and double batch extraction at 400 GeV/c for CNGS the tests comprised extractions of single bunches, twelve bunches in a single extraction and single bunches in a double extraction. The simulated and measured kick characteristics of the upgraded system are presented, along with results from uniformity calculations of the magnetic field after the modifications to accommodate the cooling circuitry. Further improvements will be discussed which are intended to make the system comply with the specifications for CNGS.  
MOPLT035 Beam Induced Heating of the SPS Fast Pulsed Magnets 623
 
  • J.A. Uythoven, G. Arduini, T. Bohl, F. Caspers, E.H.R. Gaxiola, T. Kroyer, M. Timmins, L. Vos
    CERN, Geneva
 
  Fast pulsed magnets with ferrite yokes are used in CERN?s SPS accelerator for beam injection, extraction and excitation for tune measurements. The impedance of the ferrite structures can provoke significant beam induced heating, especially for beams with high peak currents as for LHC operation, even beyond the Curie temperature. The expected heating in the different kicker systems for various operational modes is compared with beam measurements. Estimates of the beam induced power have been derived from measured beam spectra. A fast extraction kicker system has recently been equipped with a cooling system. The measured cooling performance is compared with data from laboratory setups and numerical simulations.  
TUPLT008 A Retrofit Technique for Kicker Beam-coupling Impedance Reduction 1144
 
  • F. Caspers, E.H.R. Gaxiola, T. Kroyer, M. Timmins, J.A. Uythoven
    CERN, Geneva
  • S.S. Kurennoy
    LANL/LANSCE, Los Alamos, New Mexico
 
  The reduction of the impedance of operational ferrite kicker structures may be desirable in order to avoid rebuilding such a device. Often resistively coated ceramic plates or tubes are installed for this purpose but at the expense of available aperture. Ceramic U-shaped profiles with a resistive coating fitting between the ellipse of the beam and the rectangular kicker aperture have been used to significantly reduce the impedance of the magnet, while having a limited effect on the available physical aperture Details of this method, constraints, measurements and simulation results as well as practical aspects are presented and discussed.