A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Tennant, C.

Paper Title Page
MOPKF087 The Cebaf Energy Recovery Experiment: Update and Future Plans 524
 
  • A. Freyberger, K. Beard, S.A. Bogacz, Y.-C. Chao, S. Chattopadhyay, D. Douglas, A. Hutton, L. Merminga, C. Tennant, M. Tiefenback
    Jefferson Lab, Newport News, Virginia
 
  A successful GeV scale energy recovery demonstration with a high ratio of peak-to-injection energies (50:1) was carried out on the CEBAF (Continuous Electron Beam Accelerator Facility) recirculating superconducting linear accelerator in the spring 2003. To gain a quantitative understanding of the beam behavior through the machine, data was taken to characterize the 6D phase space during the CEBAF-ER (CEBAF with Energy Recovery) experimental run. The transverse emittance and energy spread of the accelerating and energy recovered beams were measured in several locations to ascertain the beam quality preservation during energy recovery. Measurements also included the RF system's response to the energy recovery process and transverse beam profile of the energy recovered beam. One of the salient conclusions from the experiment is that the energy recovery process does not contribute significantly to the emittance degradation. The current status of the data analysis will be presented as well as plans for a GeV scale energy recovery experimental run with current doubling.