Tanabe, J.

Paper Title Page
WEPKF030 The Storage Ring Magnets of the Australian Synchrotron 1666
 
  • E. Huttel
    FZK-ISS-ANKA, Karlsruhe
  • B. Barg, A. Jackson, G. LeBlanc
    ASP, Melbourne
  • J. Tanabe
    SLAC, Menlo Park, California
 
  A 3 GeV Synchrotron Radiation Source is being built up in Melbourne, Australia. The storage ring has a circumference of 216 m and has a 14 fold DBA structure. For the storage ring the following magnets are required: 28 gradient dipoles, with B = 1.3 T, B’ = 3.35 T/m, 56 quadrupoles with a gradient of B’ = 18 T/m, 28 quadrupoles with a gradient of 9 T/m, 56 sextupoles with d2B/dr2 = 320 T/m2 and 42 with 150 T/m2. The design of pole faces was done by scaling the SPEAR III pole face to the required gap and bore of the ASP storage ring magnets. The sextupoles will be equipped with coils for horizontal and vertical correction and for a skew quadrupole. The design of the magnets and the calculated magnetic properties will be presented.  
THPKF082 The Completion of SPEAR 3 2448
 
  • R.O. Hettel, R. Akre, S. Allison, P. Bellomo, R.F. Boyce, L. Cadapan, R. Cassel, B. Choi, W.J. Corbett, D. Dell'Orco, T. Elioff, I. Evans, R. Fuller, S. Hill, D. Keeley, N. Kurita, J. Langton, G. Leyh, C. Limborg-Deprey, D. Macnair, D.J. Martin, P.A. McIntosh, E. Medvedko, C.-K. Ng, I. Nzeadibe, J. Olsen, M. Ortega, G.C. Pappas, S. Park, T. Rabedeau, H. Rarback, A. Ringwall, P. Rodriguez, J.A. Safranek, H.D. Schwarz, B. Scott, J.J. Sebek, S. Smith, T. Straumann, J. Tanabe, A. Terebilo, T.A. Trautwein, C. Wermelskirchen, M. Widmeyer, R. Yotam, K. Zuo
    SLAC/SSRL, Menlo Park, California
 
  On December 15, 2003, 8 1/2 months after the last electrons circulated in the old SPEAR2 storage ring and 5 days after the beginning of commissioning, the first electrons were accumulated in the completely new SPEAR3 ring. The rapid installation and commissioning is a testimony to the SPEAR3 project staff and collaborators who have built an excellent machine and equipped it with powerful and accessible machine modeling and control programs. The final year of component fabrication, system implementation and testing, the 7-month installation period leading up to the beginning of commissioning, and lessons learned are described.