A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Sugaya, M.

Paper Title Page
THPLT066 Commissioning of 150MeV FFAG Synchronisation 2640
 
  • Y. Yonemura, M. Matoba
    Kyushu University, Fukuoka
  • M. Aiba, M. Sugaya
    University of Tokyo, Tokyo
  • S. Machida, Y. Mori, A. Muto, J. Nakano, C. Ohmori, I. Sakai, Y. Sato, A. Takagi, T. Yokoi, M. Yoshii, M. Yoshimoto, Y. Yuasa
    KEK, Ibaraki
  • T. Uesugi
    NIRS, Chiba-shi
  • A. Yamazaki
    LNS, Sendai
 
  A 150MeV proton FFAG (Fixed Field Alternating Gradient) synchrotron has been constructed to be a prototype for various applications such as proton beam therapy. At the moment, all the components are assembled, and multi-turn injection and beam storage were successfully performed. We are in the phase of beam acceleration up to final energy and expect the beam extraction in a few months. In this paper, beam commissioning results such as multi-turn injection, orbit correction, tune survey and optimization of RF gymnastics will be presented.