A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Stockli, M.P.

Paper Title Page
TUPLT175 Operation of the SNS Ion Source at High Duty-Factor 1538
 
  • R.F. Welton, T.A. Justice, S.N. Murray, M.P. Stockli
    ORNL/SNS, Oak Ridge, Tennessee
  • R. Keller
    LBNL/AFR, Berkeley, California
 
  The ion source for the Spallation Neutron Source* (SNS) is a radio frequency, multi-cusp, source designed to deliver ~ 45 mA of H- with a normalized rms emittance of less than 0.2 pi mm mrad to the SNS accelerator. Once the SNS is fully operational a beam current duty factor of 6% (1 ms pulse length, repetition rate of 60 Hz) will be required from the ion source. To date, the source has been utilized in the early commissioning of the SNS accelerator and has already demonstrated stable, satisfactory operation at beam currents of ~30 mA with duty factors of ~0.1% for operational periods of several weeks. This work summarizes the results of a series of lifetime tests performed at a dedicated ion source test facility where the source was pushed closer to the operational goal of 6% duty factor.  
TUPLT168 SNS Beam Commisioning Status 1524
 
  • S. Henderson, A.V. Aleksandrov, S. Assadi, W. Blokland, C. Chu, S.M. Cousineau, V.V. Danilov, G.W. Dodson, J. Galambos, M. Giannella, D.-O. Jeon, S. Kim, L.V. Kravchuk, M.P. Stockli, E. Tanke, R.F. Welton, T.L. Williams
    ORNL/SNS, Oak Ridge, Tennessee
 
  The Spallation Neutron Source accelerator systems will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. The accelerator complex consists of an H- injector capable of producing 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. The linear accelerator consists of a Drift Tube Linac, a Coupled-Cavity Linac and a Superconducting Linac which provide 1.5 mA average current to the accumulator ring. The staged beam commissioning of the accelerator complex is proceeding as component installation progresses. In three separate beam commissioning runs, the H- injector and Drift Tube Linac tanks 1-3 have been commissioned at ORNL. Several important performance goals have been achieved, namely 38 mA peak beam current, 1 msec beam pulse length and 1 mA average beam current. Results and status of the beam commissioning program will be presented.  
TUPLT170 The SNS Beam Power Upgrade 1527
 
  • S. Henderson, S. Assadi, R. Cutler, V.V. Danilov, G.W. Dodson, R.E. Fuja, J. Galambos, J.A. Holmes, N. Holtkamp, D.-O. Jeon, S. Kim, L.V. Kravchuk, M.P. McCarthy, G.R. Murdoch, D.K. Olsen, T.J. Shea, M.P. Stockli
    ORNL/SNS, Oak Ridge, Tennessee
 
  The Spallation Neutron Source (SNS) accelerator systems, which consist of an H- injector, a 1 GeV linear accelerator, an accumulator ring and associated transport lines, will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. The SNS is presently under construction at Oak Ridge National Laboratory and will begin operations in 2006. Even in the baseline design, many of the accelerator subsystems are capable of supporting higher beam intensities and higher beam energy. We report on upgrade scenarios for the SNS accelerator systems which increase the 1.44 MW baseline beam power to at least 3 MW, and perhaps as high as 5 MW. The increased SNS beam power can be achieved primarily by increasing the H- ion source current, installing additional superconducting cryomodules to increase the final linac beam energy to 1.3-1.4 GeV, and modifying injection and extraction hardware in the ring to handle the increased beam energy. The upgrade beam parameters will be presented, the required hardware modifications will be described, and the beam dynamics implications will be discussed.