A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Smith, S.

Paper Title Page
MOPLT107 Nanosecond-timescale Intra-bunch-train Feedback for the Linear Collider: Results of the FONT2 Run 785
 
  • P. Burrows, T. Hartin, S.M. Hussain, S. Molloy, G.R. White
    Queen Mary University of London, London
  • C. Adolphsen, J.C. Frisch, L. Hendrickson, R.K. Jobe, T. Markiewicz, D.J. McCormick, J. Nelson, M.C. Ross, S. Smith, T.J. Smith
    SLAC, Menlo Park, California
  • R. Barlow, M. Dufau, A. Kalinin
    CCLRC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • G. Myatt, C. Perry
    OXFORDphysics, Oxford, Oxon
 
  We report on experimental results from the December 2003/January 2004 data run of the Feedback On Nanosecond Timescales (FONT) experiment at the Next Linear Collider Test Accelerator at SLAC. We built a second-generation prototype intra-train beam-based feedback system incorporating beam position monitors, fast analogue signal processors, a feedback circuit, fast-risetime amplifiers and stripline kickers. We applied a novel real-time charge-normalisation scheme to account for beam current variations along the train. We used the system to correct the position of the 170 nanosecond-long bunchtrain at NLCTA, in both 'feed forward' and 'feedback' modes. We achieved a latency of 53 nanoseconds, representing a significant improvement on FONT1 (2002), and providing a demonstration of intra-train feedback for the Linear Collider.  
THPKF082 The Completion of SPEAR 3 2448
 
  • R.O. Hettel, R. Akre, S. Allison, P. Bellomo, R.F. Boyce, L. Cadapan, R. Cassel, B. Choi, W.J. Corbett, D. Dell'Orco, T. Elioff, I. Evans, R. Fuller, S. Hill, D. Keeley, N. Kurita, J. Langton, G. Leyh, C. Limborg-Deprey, D. Macnair, D.J. Martin, P.A. McIntosh, E. Medvedko, C.-K. Ng, I. Nzeadibe, J. Olsen, M. Ortega, G.C. Pappas, S. Park, T. Rabedeau, H. Rarback, A. Ringwall, P. Rodriguez, J.A. Safranek, H.D. Schwarz, B. Scott, J.J. Sebek, S. Smith, T. Straumann, J. Tanabe, A. Terebilo, T.A. Trautwein, C. Wermelskirchen, M. Widmeyer, R. Yotam, K. Zuo
    SLAC/SSRL, Menlo Park, California
 
  On December 15, 2003, 8 1/2 months after the last electrons circulated in the old SPEAR2 storage ring and 5 days after the beginning of commissioning, the first electrons were accumulated in the completely new SPEAR3 ring. The rapid installation and commissioning is a testimony to the SPEAR3 project staff and collaborators who have built an excellent machine and equipped it with powerful and accessible machine modeling and control programs. The final year of component fabrication, system implementation and testing, the 7-month installation period leading up to the beginning of commissioning, and lessons learned are described.