A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Sheu, R.J.

Paper Title Page
THPKF046 Feasibility Study of Constant Current Operation at TLS Storage Ring 2377
 
  • G.-H. Luo, H.-P. Chang, J. Chen, C.-C. Kuo, K.-B. Liu, R.J. Sheu, H.-J. Tsai, M.-H. Wang
    NSRRC, Hsinchu
 
  Several top-up experiments were carried out at various upgrade path of Taiwan Light Source. However, there were too many obstacles laid ahead of various stages to prevent the realization of top-up injection routinely. The small gap undulators, the requirement of small emittance operation and high current operation by SC cavity have promoted the top-up injection project to hightest priority. During last one and half years, a series of beam parameters measurement, subsystem checkout, installing various sensors, control program modification and hardware upgrade made the top-up injection more likely in routine operation. Discussions on the results of some measurements of booster and storage ring, the requirement of hardware upgrade and the future executable plan will be presented in this paper.