Paper |
Title |
Page |
TUPLT091 |
Fabrication Status of the PEFP 20 MeV DTL
|
1369 |
|
- M.-Y. Park, Y.-S. Cho, J.-H. Jang, Y.H. Kim, H.-J. Kwon
KAERI, Daejon
|
|
|
The PEFP (Proton Engineering Frontier Project) 20 MeV DTL have been constructed in KAERI site. The fabrication of the first tank is finished and the DT installation is in the process. We choose the pool-type electromagnets as the focusing magnet and 50 DTs will be installed on first tank. We tested the winding schemes of copper coils on the iron core and measured the magnetic field saturation.In this paper, the results of the tank fabrication and quadrupole magnet test are presented.
|
|