MOPLT017 Beam Commissioning of the SPS LSS4 Extraction and the TT40 Transfer Line 569
 
  • B. Goddard, P. Collier, M. Lamont, V. Mertens, K. Sigerud, J.A. Uythoven, J. Wenninger
    CERN, Geneva
 
  The new fast extraction system in LSS4 of the SPS and the transfer line TT40 were installed between 2000 and 2003, and commissioned with beam in late 2003. The extraction system and transfer line will serve both the anti-clockwise ring of the Large Hadron Collider (LHC), and the long baseline neutrino (CNGS) facility. The layout and functionality of the main elements are briefly explained, including the various hardware subsystems and the controls system. The safety procedures, test objectives and results of the system commissioning with beam are described, together with the test methodology. Conclusions are drawn concerning the performance of the system elements, agreement between predicted and expected activation levels and test efficiency and procedures. The test results are also briefly discussed in the context of future LHC beam commissioning activities.  
MOPLT018 Aperture and Delivery Precision of the LHC Injection System 572
 
  • B. Goddard, M. Gyr, J.-B. Jeanneret, V. Kain, M. Lamont, V. Maire, V. Mertens, J. Wenninger
    CERN, Geneva
 
  The main LHC injection elements in interaction regions 2 and 8 comprise the injection septa (MSI), the injection kicker (MKI), together with three families of passive protection devices (TDI, TCDD and TCLI). The apertures of the injection septa for the injected and two circulating beams are detailed with a new enlarged vacuum chamber and final septum alignment. The circulating beam aperture of the TDI is detailed with a new TDI support design and modified vacuum tank alignment. A modified TCDD shape is also presented and the implications for the aperture and protection level discussed. The various errors in the SPS, the transfer lines and the injection system, which contribute to injection errors, are analysed, and the expected performance of the system is derived, in terms of the expected delivery precision of the injected beam.  
MOPLT022 The Expected Performance of the LHC Injection Protection System 584
 
  • V. Kain, O.S. Brüning, L. Ducimetière, B. Goddard, M. Lamont, V. Mertens
    CERN, Geneva
 
  The passive protection devices TDI, TCDD and TCLI are required to prevent damage to the LHC in case of serious injection failures, in particular of the MKI injection kicker. A detailed particle tracking, taking realistic mechanical, positioning, injection, closed orbit and local optical errors into account, has been used to determine the required settings of the absorber elements to guarantee protection against different MKI failure modes. The expected protection level of the combination of TDI with TCLI, with the new TCLI layout, is presented. Conclusions are drawn concerning the expected damage risk level.  
MOPLT025 Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8 593
 
  • V. Mertens, B. Goddard, T. Risselada
    CERN, Geneva
 
  Beam transfer from the CERN Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC) will be done through the two transfer lines TI 2 and TI 8, presently under construction, with a combined length of about 5.6 km. The final layout, optics design and correction scheme for these lines will be presented. The requirement of simultaneously matching their geometry and optics with that of the LHC will be treated, including the methodology for alignment of the elements along the line and a proposed solution in the final matching section. After the commissioning of the short transfer line TT40 just upstream of TI 8 in 2003, beam tests of the whole of TI 8 are scheduled for autumn 2004, with the aim to validate many of the new features and mechanisms involved in the future control and operation of these lines. The status of the installation will be described, comprising the progress with infrastructure, services and line elements. An outlook will be given for the work remaining until 2007.  
WEPLT024 Scheduling the Installation of the LHC Injection Lines 1876
 
  • L. Lari, H. Gaillard, V. Mertens
    CERN, Geneva
 
  The installation of the two LHC injection lines has to fit within tight milestones of the LHC project and of CERN?s accelerator activity in general. For instance, the transfer line from the SPS to LHC point 8 (to fill the anti-clockwise LHC ring) should be tested with beam before the end of 2004 since the SPS will not run in 2005. It will first serve during the LHC sector test in 2006. Time constraints are also very strong on the installation of the transfer line from the SPS to LHC point 2 (for the clockwise LHC ring): its tunnel is the sole access for the LHC cryo-magnets and a large part of the beam line can only be installed once practically all LHC cryo-magnets are in place. Of course, the line must be operational when the LHC starts. This paper presents the various constraints and how they are taken into account for the logistics and installation planning of the LHC injection lines.