Paper |
Title |
Page |
MOPLT167 |
RHIC Operation with Longitudinally Polarized Protons
|
920 |
|
- H. Huang, M. Bai, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, K.A. Drees, W. Fischer, A.U. Luccio, W.W. MacKay, C. Montag, F.C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, S. Tepikian, D. Trbojevic, J. Van Zeijts, A.Y. Zelinsky, S.Y. Zhang
BNL, Upton, Long Island, New York
|
|
|
Longitudinally polarized proton beams have been accelerated, stored and collided at 100GeV in the Relativistic Heavy Ion Collider (RHIC) to study spin effects in the hadronic reactions. The essential equipment includes four Siberian snakes, eight spin rotators and a fast relative polarimeters in each of the two RHIC rings as well as local polarimeters at the STAR and PHENIX detectors. This paper summarizes the performance of RHIC as a polarized proton collider.
|
|
TUPLT190 |
Acceleration of Polarized Beams using Multiple Strong Partial Siberian Snakes
|
1577 |
|
- T. Roser, L. Ahrens, M. Bai, E.D. Courant, J. Glenn, R.C. Gupta, H. Huang, A.U. Luccio, W.W. MacKay, N. Tsoupas, E. Willen
BNL, Upton, Long Island, New York
- M. Okamura, J. Takano
RIKEN, Saitama
|
|
|
Acceleration of polarized protons in the energy range of 5 to 25 GeV is particularly difficult since depolarizing spin resonances are strong enough to cause significant depolarization but full Siberian snakes cause intolerably large orbit excursions. Using a 20 - 30 % partial Siberian snake both imperfection and intrinsic resonances can be overcome. Such a strong partial Siberian snake was designed for the Brookhaven AGS using a dual pitch helical superconducting dipole. Multiple strong partial snakes are also discussed for spin matching at beam injection and extraction.
|
|
WEPLT114 |
Field Measurements in the AGS Warm Snake
|
2113 |
|
- J. Takano, M. Okamura
RIKEN, Saitama
- R. Alforque, R. Belkin, G. Ganetis, A.K. Jain, W.W. MacKay, T. Roser, R. Thomas, J. Tuozzolo
BNL, Upton, Long Island, New York
- T. Hattori
RLNR, Tokyo
|
|
|
A new warm snake has been produced for avoiding the transverse coupling resonance in the Alternating Gradient Synchrotron (AGS) at Brookhaven National Laboratory (BNL). The warm snake is the world?s first normal conducting helical dipole partial snake which has a double pitch structure to allow spin rotation with no net beam offset or deflection with a single magnet. The warm snake is 2.6m long, and has a field of 1.5 Tesla for a 9 degrees spin rotation. The pitches, current density, and shims were optimized by using OPERA_3D / TOSCA. The magnetic field harmonics have been measured using a system of 51 mm long, 34 mm radius tangential coils. The axial variation of the dipole field angle agrees very well with the calculations, indicating no significant construction errors. However, the measured transfer function shows a discrepancy of 4% which may be caused by BH-curve differences, deformation of the iron and packing factor of the laminations. To correct the beam trajectory the operating current was adjusted and shims were installed on the end plates. These optimization studies, and comparison with measurements, will be shown.
|
|
MOPLT165 |
Luminosity Increases in Gold-gold Operation in RHIC
|
917 |
|
- W. Fischer, L. Ahrens, J. Alessi, M. Bai, D. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, J. Butler, R. Calaga, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fu, G. Ganetis, J. Glenn, T. Hayes, P. He, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R. Lee, Y. Luo, W.W. MacKay, G. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, C. Pearson, S. Peggs, A. Pendzick, F.C. Pilat, V. Ptitsyn, T. Roser, J. Sandberg, T. Satogata, C. Schultheiss, A. Sidi-Yekhlef, L. Smart, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J. Tuozzolo, J. Van Zeijts, K. Vetter, K. Yip, A. Zaltsman, S.Y. Zhang, W. Zhang
BNL, Upton, Long Island, New York
|
|
|
After an exploratory phase, during which a number of beam parameters were varied, the RHIC experiments now demand high luminosity to study heavy ion collisions in detail. Presently RHIC operates routinely above its design luminosity. In the first 4 weeks of its current operating period (Run-4) the machine has delivered more integrated luminosity that during the 14 weeks of the last gold-gold operating period (Run-2). We give an overview of the changes that increased the instantaneous luminosity and luminosity lifetime, raised the reliability, and improved the operational efficiency.
|
|
MOPLT170 |
eRHIC, Future Electron-ion Collider at BNL
|
923 |
|
- V. Ptitsyn, L. Ahrens, M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, J.M. Brennan, R. Calaga, X. Chang, E.D. Courant, A. Deshpande, A.V. Fedotov, W. Fischer, H. Hahn, J. Kewisch, V. Litvinenko, W.W. MacKay, C. Montag, S. Ozaki, B. Parker, S. Peggs, T. Roser, A. Ruggiero, B. Surrow, S. Tepikian, D. Trbojevic, V. Yakimenko, S.Y. Zhang
BNL, Upton, Long Island, New York
- D.P. Barber
DESY, Hamburg
- M. Farkhondeh, W. Franklin, W. Graves, R. Milner, C. Tschalaer, J. Van der Laan, D. Wang, F. Wang, A. Zolfaghari, T. Zwart
MIT/BLAC, Middleton, Massachusetts
- A.V. Otboev, Y.M. Shatunov
BINP SB RAS, Novosibirsk
|
|
|
The paper reviews the progress made lately in the design of eRHIC, proposed future electron-ion collider on the basis of the existing RHIC machine. The eRHIC aims to provide collisions of electrons and positrons on ions and protons in center mass energy range of 25-70 GeV. The goal luminosities are in 1032-1033 1/(s*cm2) values for e-p and in 1030-1031 1/(s*cm2) values for e-Au collisions. An essential design requirement is to provide longitudinally polarized beams of electrons and protons (and, possibly lighter ions) at the collision point. The eRHIC ZDR has been recently developed which considers various aspects of the accelerator design. An electron accelerator, which delivers about 0.5A polarized electron beam current in the electron energy range of 5 to 10 GeV, should be constructed at the BNL near existing ion rings of the RHIC collider and should intersect an ion ring at least in one of the available ion ring interaction regions. In order to reach the luminosity goals some upgrades in ion rings also would be required. Ways to reach lower beam emmittances (electron cooling) and higher beam intensities have to be realized.
|
|
MOPLT178 |
RHIC Pressure Rise
|
944 |
|
- S.Y. Zhang, J. Alessi, M. Bai, M. Blaskiewicz, P. Cameron, K.A. Drees, W. Fischer, R.P. Fliller III, D. Gassner, J. Gullotta, P. He, H.-C. Hseuh, H. Huang, U. Iriso, R. Lee, Y. Luo, W.W. MacKay, C. Montag, B. Oerter, S. Peggs, F.C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, L. Smart, P. Thieberger, D. Trbojevic, J. Van Zeijts, L. Wang, J. Wei, K. Zeno
BNL, Upton, Long Island, New York
|
|
|
Beam induced pressure rise remains an intensity limit at the RHIC for both heavy ion and polarized proton operations. The beam injection pressure rise at warm sections has been diagnosed due to electron cloud effect. In addition, pressure rise of heavy ion operation at the beam transition has caused experiment background problem in deuteron-gold run, and it is expected to take place in gold-gold run at high intensities. This type of pressure rise is related to beam momentum spread, and the electron cloud seems not dominant. Extensive approaches for both diagnosis and looking-for-remedies are undergoing in the current gold operation, RUN 4. Results of beam scrubbing, NEG pipe in RHIC ring, beam scraping test of ion desorption, beam momentum effect at the transition, beam gap effect, solenoid effect, and NEG pipe ion desorption test stand will be presented.
|
|