A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Luo, G.-H.

Paper Title Page
THPKF045 Accelerator Physics Issues at NSRRC 2374
 
  • C.-C. Kuo, H.-P. Chang, P.J. Chou, K.-T. Hsu, G.-H. Luo, H.-J. Tsai, M.-H. Wang
    NSRRC, Hsinchu
 
  Over the past decade, NSRRC has served the synchrotron light users with its 1.5 GeV third-generation storage ring. To provide stable hard x-ray for the x-ray community, two strong-field superconduting wigglers have been installed and three more will be put in such a low energy ring. A superconduting rf cavity is to replace the conventional ones and the beam current will be double too. Top-up injection study is underway. This paper presents the accelerator physics issues at NSRRC such as single particle dynamics and collective effects.  
THPKF046 Feasibility Study of Constant Current Operation at TLS Storage Ring 2377
 
  • G.-H. Luo, H.-P. Chang, J. Chen, C.-C. Kuo, K.-B. Liu, R.J. Sheu, H.-J. Tsai, M.-H. Wang
    NSRRC, Hsinchu
 
  Several top-up experiments were carried out at various upgrade path of Taiwan Light Source. However, there were too many obstacles laid ahead of various stages to prevent the realization of top-up injection routinely. The small gap undulators, the requirement of small emittance operation and high current operation by SC cavity have promoted the top-up injection project to hightest priority. During last one and half years, a series of beam parameters measurement, subsystem checkout, installing various sensors, control program modification and hardware upgrade made the top-up injection more likely in routine operation. Discussions on the results of some measurements of booster and storage ring, the requirement of hardware upgrade and the future executable plan will be presented in this paper.