Paper Title Page
WEPKF006 Field Quality and Hysteresis of LHC Superconducting Corrector Magnets 1600
 
  • A. Santrich Badal, M. Allitt, C. Giloux, M. Karppinen, A.M. Lombardi, V. Remondino, W.  Venturini Delsolaro, R. Wolf
    CERN, Geneva
  • M. Bagre, P. Khare, T. Maurya, A. Puntambekar
    CAT, Indore (M.P.)
 
  The Large Hadron Collider (LHC) will use some 6400 superconducting corrector magnets. There are 19 corrector types. These are assembled 14 different types of magnets of which 4 are nested. They are being manufactured by 4 firms in Europe and 3 in India. The magnetic field quality is measured at room temperature by 12 magnetic measurement benches employed by the corrector manufacturers. CERN performs magnetic measurement at 4.2K and at 1.9K on a small subset of corrector magnets. The paper discusses the correlation between the warm and cold field measurements. The field quality is compared to the magnet design expectations and to the target field quality for LHC. Many corrector circuits will be powered in a way which cannot be predicted before LHC will start operation and which even then may change between physics runs. The measured magnetic hysteresis and its influence on possible setting errors during operation is discussed, in particular for the orbit correctors and the tuning/trim quadrupole magnet circuits.  
WEPLT026 Dynamic Aperture Reduction from the Dodecapole Component in the LHC Main Quadrupoles and its Mechanism. 1882
 
  • A.M. Lombardi, O.S. Brüning, S.D. Fartoukh, T. Risselada, F. Schmidt, A. Verdier
    CERN, Geneva
 
  The systematic dodecapole component in the Main Quadrupoles of the LHC lattice has a strong influence on the machine dynamic aperture at injection. In this paper we quantify this effect with the help of tracking studies, explain the mechanism for the loss in dynamic aperture and look into potential correction schemes. Finally, we provide an estimate for the maximum allowed systematic dodecapole component in the MQ.  
TUPLT011 The LHC Lead Ion Injector Chain 1153
 
  • K. Schindl, A. Beuret, A. Blas, J. Borburgh, H. Burkhardt, C. Carli, M. Chanel, T. Fowler, M. Gourber-Pace, S. Hancock, C.E. Hill, M. Hourican, J.M. Jowett, K. Kahle, D. Kuchler, A.M. Lombardi, E. Mahner, D. Manglunki, M. Martini, S. Maury, F. Pedersen, U. Raich, C. Rossi, J.-P. Royer, R. Scrivens, L. Sermeus, E.N. Shaposhnikova, G. Tranquille, M. Vretenar, T. Zickler
    CERN, Geneva
 
  A sizeable part of the LHC physics programme foresees heavy ion (lead-lead) collisions with a design luminosity of 1027 cm-2 s-1. This will be achieved after an upgrade of the ion injector chain comprising Linac3, LEIR, PS and SPS machines. Each LHC ring will be filled in ~10 minutes with ~600 bunches, each of 7 107 Pb ions. Central to the scheme is the Low Energy Ion Ring (LEIR), which transforms long pulses from Linac3 to high-brilliance bunches by means of 6D multi-turn injection and accumulation via electron cooling. Major limitations along the chain, including space charge, intra-beam scattering, vacuum issues, and emittance preservation are highlighted. The conversion from LEAR (Low Energy Antiproton Ring) to LEIR includes new magnets and power converters, high-current electron cooling, broad-band RF cavities, upgraded beam diagnostics, and UHV vacuum equipment relying on beam scrubbing to achieve a few 10-12 mbar. Major hardware changes in Linac3 (Electron Cyclotron Resonance source, repetition rate, energy ramping cavity), PS (new injection hardware, elaborate RF gymnastics, stripping insertion), and SPS (100 MHz system) are described. An early beam scenario, using fewer bunches but the same bunch intensity to deliver a lower luminosity, reduces the work required for LHC ion operation in spring 2008.