A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kuo, C.H.

Paper Title Page
WEPKF055 Design and Implementation of a Switching Mode Bipolar Power Stage of the Correction Power Supply 1729
 
  • C.-Y. Liu, C.H. Kuo, K.-B. Liu
    NSRRC, Hsinchu
 
  In order to enhance efficiency of the correction power supply, the switching mode bipolar power stage was to implement and to substitute for the original power stage of the correction power supply. To ensure higher efficiency, the programming dc bus voltage of the power stage of the correction power supply must be working in accordance with the output current state and load. A new power conversion stage was constructed and employs power MOSFET operating at higher switching frequency then old 60 Hz energy conversion mode system. This will not only improve the efficiency but also decrease the weight of the correction power supply. The new switching mode power stage supply a bipolar power dc bus power and automatic turning working voltage by the feedback balance circuit. Results and working performance will be presented in this paper.  
WEPLT120 Control Environment for the Superconducting Insertion Devices at NSRRC 2131
 
  • J. Chen, C.-K. Chang, K.-T. Hsu, K.H. Hu, C.H. Kuo, C.-J. Wang
    NSRRC, Hsinchu
 
  To enhance hard X-ray capability in the 1.5 GeV storage ring of NSRRC to serve the rapidly growing X-ray user community in Taiwan, the storage ring was installed two superconducting insertion devices. Three more superconducting insertion devices are in planning. A 6 Tesla superconducting wavelength shifter was installed in mid-2002. A 3.2 Tesla superconducting multi-pole wiggler was installed in December of 2003. Control system and operation environment have been set up to support the operation of the superconducting insertion devices. The implementation and operation experiences will be summarized in this report.  
THPKF044 The Improvement of NSRRC Linac for Top-up Mode Operation 2371
 
  • J.-Y. Hwang, J. Chen, J.-P. Chiou, K.-T. Hsu, S.Y. Hsu, K.H. Hu, T.C. King, C.H. Kuo, K.-K. Lin, C.-J. Wang, Y.-T. Yang
    NSRRC, Hsinchu
  • C.T. Pan
    NTHU, Hsinchu
 
  The performance of the 50 MeV linac at the National Synchrotron Radiation Research Center (NSRRC) was examined and has been improved recently. The major improved items were 1) adopting a command-charging scheme to replace the resonance charging for the linac modulator; and 2) gun electronics. As a result, the beam quality was improved in terms of its energy spectrum and stability. The correlation between the improvement of beam quality and component upgrading is analyzed. The influence of the beam quality improvement to the recently proposed top-up mode operation in 2005 will also be discussed in this report.  
THPLT090 The Operating of Digital Beam Position Monitor in NSRRC 2703
 
  • C.H. Kuo, J. Chen, K.-T. Hsu, K.H. Hu, D. Lee
    NSRRC, Hsinchu
 
  The digital beam position monitors are configured to operation system in the NSRRC now. This integration includes of multi-channel access, channel calibration, gain control, and parameter control to meet various operation condition, perform functionality and performance evaluation. The programmability nature of DBPM system is essential for multi-mode high precision beam position measurement. The system will support high performance beam position, turn-by-turn beam position, tune and other diagnostic measurements. Control system interface was implemented to support the operation of DBPM system. T various aspects will be discussed and presented in this report.  
THPLT091 The Synchrotron Radiation Monitor Upgradation in NSRRC 2706
 
  • C.H. Kuo, J. Chen, K.-T. Hsu, S.Y. Hsu, Y.-T. Yang
    NSRRC, Hsinchu
 
  Synchrotron radiation monitor in the storage has been operated for a long time. This system is upgrading to booster operation now. The basic system includes optics, digital image acquisition, image analysis, compressed image transportation and visualization tools at workstation. The linearity and dynamic of new is discussed for some beam physics study. This system is also supported to the booster by new camera and addition operation. The hardware configuration and software structure will be summarized in this report.