A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Koontz, R.F.

  
Paper Title Page
MOOCH02 First Full Beam Loading Operation with the CTF3 Linac 39
 
  • R. Corsini, H.-H. Braun, G. Carron, O. Forstner, G. Geschonke, E. Jensen, L. Rinolfi, D. Schulte, F. Tecker, L. Thorndahl
    CERN, Geneva
  • M. Bernard, G. Bienvenu, T. Garvey, R. Roux
    LAL, Orsay
  • A. Ferrari
    Uppsala University, Uppsala
  • L. Groening
    GSI, Darmstadt
  • R.F. Koontz, R.H. Miller, R.D. Ruth, A.D. Yeremian
    SLAC, Menlo Park, California
  • T. Lefevre
    NU, Evanston
 
  The aim of the CLIC Study is to investigate the feasibility of a high luminosity, multi-TeV linear e+e- collider. CLIC is based on a two-beam method, in which a high current drive beam is decelerated to produce 30 GHz RF power needed for high-gradient acceleration of the main beam running parallel to it. To demonstrate the outstanding feasibility issues of the scheme a new CLIC Test Facility, CTF3, is being constructed at CERN by an international collaboration. In its final configuration CTF3 will consist of a 150 MeV drive beam linac followed by a 42 m long delay loop and an 84 m combiner ring. The installation will include a 30 GHz high power test stand, a representative CLIC module and a test decelerator. The first part of the linac was installed and commissioned with beam in 2003. The first issue addressed was the generation and acceleration of a high-current drive beam in the "full beam loading" condition where RF power is converted into beam power with an efficiency of more than 90%. The full beam loading operation was successfully demonstrated with the nominal beam current of 3.5 A. A variety of beam measurements have been performed, showing good agreement with expectations.  
Video of talk
Transparencies