A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Konstantinov, S.G.

Paper Title Page
THPKF052 The Project of Accelerator Mass-Spectrometer at BINP 2386
 
  • M. Petrichenkov, N. Alinovsky, V. Klyuev, E. Konstantinov, S.G. Konstantinov, A. Kozhemyakin, A. Kryuchkov, V.V. Parkhomchuk, A. Popov, S. Rastigeev, V.B. Reva, B. Sukhina
    BINP SB RAS, Novosibirsk
 
  The project of creation of first Russian accelerator mass-spectrometer at BINP is described. The scheme of spectrometer includes two types of ion sources (sputter and gaseous ones), low energy beam line with analysers, electrostatic tandem accelerator with accelerating voltage up to 2 MV and magnesium vapours stripper and also includes the high energy beam line with analysers. The results of first experiments with ion sources are given also.  
TUPLT120 Commissioning of Electron Cooler EC-300 1419
 
  • V.B. Reva, E.A. Bekhtenev, V.N. Bocharov, A.V. Bubley, Y. Evtushenko, A.D. Goncharov, A.V. Ivanov, V.I. Kokoulin, V.V. Kolmogorov, M.N. Kondaurov, S.G. Konstantinov, V.R. Kozak, G.S. Krainov, Ya.G. Kruchkov, E.A. Kuper, A.S. Medvedko, L.A. Mironenko, V.M. Panasyuk, V.V. Parkhomchuk, K.K. Schreiner, B.A. Skarbo, A.N. Skrinsky, B.M. Smirnov, M.A. Vedenev, R. Voskoboinikov, M.N. Zakhvatkin, N.P. Zapiatkin
    BINP SB RAS, Novosibirsk
  • J. Li, W. Lu, L.J. Mao, Z.X. Wang, X.B. Yan, X.D. Yang, J.H. Zhang, W. Zhang, H.W. Zhao
    IMP, Lanzhou
 
  The article deals with the commissioning of electron cooler EC-300. It was designed and manufactured for CSR experiment (IMP, Lanzhou, China) by BINP, Russia. The energy of electron beam is up to 300 keV, the electron current is up to 3 A, the magnetic field in the cooling section is up to 1.5 kG. The major innovation of the cooler is the variable profile of electron beam, the electrostatic bends of the electron beam and the system of the magnetic field correction. During commissioning the linearity of the magnetic field 10-6 was obtained, the recuperation efficiency was observed up 10-6 , the pressure of residual gas in the vacuum chamber was 5· 10-11 torr during operation with the electron beam. The CSRe cooler for IMP is a new step at cooling technique and the first results achieved during commissioning are very interesting for accelerator physics.