A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kobayashi, Y.

Paper Title Page
MOPLT069 Investigation of Injection for the Low-emittance Lattice with New-6.25 ohm Kicker Magnet System at the Photon Factory 710
 
  • A. Ueda, K. Harada, Y. Kobayashi, T. Mitsuhashi
    KEK, Ibaraki
 
  We installed 6.25ohm traveling-wave kicker magnet in the Photon Factory to obtain a wide acceptance for the injected beam into the low-emittance lattice of the Photon Factory. We investigate the injection for the low-emittance lattice with this 6.25ohm kicker magnet system. Hence we have optical beam diagnostic systems which source point is inside of injection bump, we use this system for the investigation of injection. The pulse shape of the injection bump was measured by the optical beam profile monitor with high-speed gated camera by using a stored beam. The result of pulse shape of injection bump was agreed with the predicted one by using result of magnetic field measurement, and pulse duration was shorter than twice of revolution time. The instantaneous beam profile of injected beam was observed in turn by turn by using the same beam profile monitor system. We measure the turn by turn position of the injected beam from this observation and compare with a simulation. We also observe a smear out of beam oscillation by nonlinear effect from this instantaneous beam profile measurement.  
WEPLT106 Growth and Suppression Time of an Ion-related Vertical Instability 2095
 
  • T. Miyajima, Y. Kobayashi, S. Nagahashi
    KEK, Ibaraki
 
  In the KEK Photon Factory electron storage ring, a vertical instability has been observed in a multi-bunch operation mode. The instability can be suppressed by octupole magnetic field in routine operation. Since the instability depends on a vacuum condition in the ring, it seems that it is an ion-related phenomenon. In order to study this instability, we measured the growth and the suppression time of it with the pulse octupole magnet system, which can produce the octupole field with rise and fall time of around 1.2msec. We obtained the result that the instability was grown slowly compared with to suppress it, and the growth time depended on the fill pattern of the bunch train and the beam current per bunch.  
THPLT063 Proposal of Carbon-beam Facility for Cancer Therapy in Japan 2631
 
  • K. Noda, T. Fujisawa, T. Furukawa, Y. Iwata, T. Kanai, M. Kanazawa, N. Kanematsu, A. Kitagawa, Y. Kobayashi, M. Komori, S. Minohara, T. Murakami, M. Muramatsu, S. Sato, Y. Sato, S. Shibuya, E. Takada, O. Takahashi, M. Torikoshi, E. Urakabe, S. Yamada, K. Yoshida
    NIRS, Chiba-shi
 
  Since 1994, the clinical trial at HIMAC has been successfully being progressed and more than 1,700 patients have treated with carbon ions. Owing to the good result of HIMAC, several medical groups in Japan have strongly required the carbon therapy facility. Based on the development of accelerator and the irradiation technologies for 10 years, therefore, we started to design a carbon therapy facility in Japan. The accelerator complex for the facility consists of two ECR ion sources with permanent magnets, an injector linac cascade (RFQ+IH) with the energy of 4 MeV/n, a synchrotron ring with the maximum energy of 400 MeV/n and beam delivery system for three treatment rooms. The R&D for the new facility has been already approved and will be started from April 2004. We will describe the conceptual design of the new facility.