TUPLT089 Status of PEFP 3MeV RFQ Development 1363
 
  • Y.-S. Cho, B.-H. Choi, S.-H. Han, J.-H. Jang, Y.H. Kim, H.-J. Kwon, C.-B. Shim
    KAERI, Daejon
 
  In the PEFP (Proton Engineering Frontier Project), a 350MHz, 3MeV RFQ (Radio Frequency Quadrupole) has been developed and tested. The tuning results showed that the resonant frequency is somewhat higher than 350MHz and other methods in addition to slug tuners should be used to tune the cavity correctly. To check the cavity characteristics, high power RF test has been done. The required peak RF power is 600kW and pulse width, repetition rate for initial test are 100 micro-s, 10Hz respectively. To solve the problems in PEFP RFQ, the upgrade design of 3MeV RFQ has been decided. The main concept of this upgrade design is constant vane voltage profile with the same length of RFQ. The other parameters (350MHz, 3MeV, 20mA) are the same with the previous RFQ. With constant vane voltage profile, fabrication of RFQ can be easier, and with the same mechanical dimension, other parts such as vacuum pumping station can be re-used. In this paper, the test results of the PEFP RFQ, and the details of beam dynamics design/engineering design of upgrade RFQ will be presented.  
TUPLT091 Fabrication Status of the PEFP 20 MeV DTL 1369
 
  • M.-Y. Park, Y.-S. Cho, J.-H. Jang, Y.H. Kim, H.-J. Kwon
    KAERI, Daejon
 
  The PEFP (Proton Engineering Frontier Project) 20 MeV DTL have been constructed in KAERI site. The fabrication of the first tank is finished and the DT installation is in the process. We choose the pool-type electromagnets as the focusing magnet and 50 DTs will be installed on first tank. We tested the winding schemes of copper coils on the iron core and measured the magnetic field saturation.In this paper, the results of the tank fabrication and quadrupole magnet test are presented.