A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kim, S.-C.

Paper Title Page
TUPLT096 RFQ Low Level RF System for the PEFP 100MeV Proton Linac 1381
 
  • I.H. Yu, M.-H. Chun, K.M. Ha, Y.J. Han, W.H. Hwang, M.H. Jeong, H.-S. Kang, D.T. Kim, S.-C. Kim, I.-S. Park, J.S. Yang
    PAL, Pohang
  • Y.-S. Cho, K.T. Seol
    KAERI, Daejon
 
  The 100MeV Proton linear accelerator (Linac) for the PEFP (Proton Engineering Frontier Project) will include a 3MeV, 350MHz RFQ(Radio-Frequency Quadrupole) Linac. The RFQ accelerates a 20mA proton beam from 50keV to 3MeV. The low level RF system for RFQ provides field control. In addition to field control, it provides cavity resonance control. An accelerator electric field stability of ± 1% in amplitude and ± 1° in phase is required for the RF system. The low level RF system has been designed and is now being fabricated.  
WEPKF050 Measurement of Fast High Voltage Pulse and High Noisy DC Siganla for Modulator at the PLS Linac 1717
 
  • S.-C. Kim, Y.J. Han, S.H. Kim, S.-H. Nam, S.S. Park
    PAL, Pohang
 
  The 2.5-GeV electron linac at Pohang accelerator laboratory (PAL) has been operated continuously as a full energy injector for the Pohang Light Source (PLS) since Dec. 1994. There have been continuous efforts to improve the klystron-modulator system more stable and reliable. At pulse operated modulator system, important pulse and DC signals are beam voltage, beam current, EOLC current HVDC voltage and HVDC current. Pulse signals are fast high voltage pulse 30 Hz, 5ms. These signals are adequate level down from modulator but including high level switching noisy. To amplitude measure of these signals for every trigger signal, we developed special module sampling hold, A/D, calculating and D/A. The output signals of these modules are 0 ~ 10 V DC signal and not include any noise signal. These output signals are connected interlock interface module of the modulator controller. Therefore computer system (PC) of the modulator controller is free to noise of these signals and can precise monitor pulse & noise DC signal. In these paper, we are described itself characteristics pulse and high noisy DC signals of the modulator, signal conditioning technique after noise elimination and operation status of the modulator controller.  
WEPKF051 Operational Analysis of PLS 2-GeV Electron Linac Klystron-modulator System 1720
 
  • S.S. Park, Y.J. Han, S.H. Kim, S.-C. Kim, S.-H. Nam
    PAL, Pohang
 
  The klystron-modulator(K&M) system of the Pohang Light Source(PLS) had been supplying high power microwaves for the acceleration of 2 GeV electron beams. There are 11 sets of K&M systems to accelerate electron beams to 2 GeV nominal beam energy without operating one klystron-modulator. One module of the K&M system consists of an 80 MW S-band (2856 MHZ) klystron tube and the matching 200 MW modulator. The total accumulated high-voltage run-time of the oldest unit among the 12 K&M systems has reached nearly 68,000 hours as of Dec. 2003 and the summation of all the units' high voltage run-time is approximately 820,000 hours. The overall system availability is well over 95%. There have been continuous efforts to improve the klystron-modulator system more stable and reliable. To improve self-diagnostic, operation, monitoring, and remote communication, we developed a new modulator controller based on an industrial PC platform in 2002. In this paper, we are able to review overall system performance of the high-power K&M system and the operational characteristics of the klystrons and thyratrons, and overall system's availability analysis from Jan. to Dec. 2003.